For calculation a scenario in Planner, the forest data and timber and cost tables are needed. In the scenario setup, you have to select the forest data, calculation model, price and cost tables. You also have to enter the discount rate. The calculation can be started after saving these settings.
In advanced settings you can define whether the scenario is optimised and if, give the constraints for the optimisation when needed. It's also possible to define how the operations included in the forest data are taken into account in the calculation.
Comments
0 comments
Please sign in to leave a comment.